Tuesday Construction Update

One of the guys got here about 7 and started working. Apparently, the other guy got sick on the way in. So, after an hour and a half of working, Mr. Bill sent him on to another site. However, in that hour and a half, he got the outside plywood walls up onto the frame! I didn’t get pictures because there was not a lot of time with ballet, speech, and a quick trip to the doctor (Ace has a sinus infection) and Bible study.

I forgot to add that when I talked with Mr. Bill on Monday, he sai all the work should be done in 4 to 6 weeks. I’m thinking about 10 just to give or take a few snags.

Facebooktwittermail

Leave a Reply

Your email address will not be published. Required fields are marked *